THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6., This news data comes from:http://uy-li-tku-txo.ycyzqzxyh.com
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.

Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- US strike marks shift to military action against drug cartels
- Earthquake kills 250, injures 500 in Afghanistan
- Lawmaker questions 340% NTF-ELCAC budget increase
- Israel expects 1 million Gazans to flee new offensive
- Thai PM Paetongtarn Shinawatra sacked; new turmoil feared
- Public Works chief to press criminal charges against Bulacan engineer
- Sen. Go files bills to push health, social, and labor reforms
- ₱1.7M shabu seized in Taguig buy-bust
- Marcos wants subpoena power for body investigating flood projects
- Fewer Chinese ships seen in Ayungin Shoal